The City Council tenders the works of the coastal corridor section in Bahía Dorada

The coastal corridor project is nearing completion and already connects more than 21 kilometers of coastline.

The Estepona City Council has put out to tender the works for the execution of the section of the coastal corridor corresponding to the Bahía Dorada area. In this way, a further step is taken in the ambitious project of pedestrian connection of the entire seafront of the municipality.

This new section will connect the existing promenades between the urbanization La Galera Beach and the land path of Bahia Dorada, through a wooden pedestrian walkway 168 meters long. The main objective is the recovery of this space for public use, improving accessibility and landscape integration of the coastline, while ensuring the protection of the maritime-terrestrial public domain.

The project includes the construction of a wooden decking path supported on porticoes, which will be set on prefabricated concrete footings and wooden piles, depending on the conditions of the terrain. The platform will have a useful width of three meters, with safety railings on both sides, and will be equipped with LED lighting beacons on the pavement to ensure safety and visibility at night, without generating glare. The base bidding budget is 299,634 euros (VAT included).

With this action, the Consistory continues to move forward in the consolidation of the coastal corridor as one of the major axes of urban and tourist transformation of the municipality, facilitating walking or cycling along the entire coast of Estepona and betting on sustainable mobility, safe and accessible to all.

Featured Properties

More news